If the pads are completed in Thailand, and have to get to Canada, from a logistics standpoint, ocean transit time is 30-48 days, so add at least that time to get to the distribution center before they can ship to TGC (and if distribution comes from the U.S, then they need to be imported there first, then exported to Canada, before being re-imported to the U.S. if you live here.) Not likely to be shipped by air as that is a premium freight cost, and shouldn't be utilized by a manufacturer that needs to keep costs low. Warrior probably makes a bulk shipment once enough sets can be palletized for shipment. Assume that's, at minimum, at least 8-12 sets (not economical) all the way up to a half-container load (at least 64 sets). I'm assuming here on some of the stats, but wanted to try to help out with some understanding that shipping can be a beautiful thing and a logistical nightmare. They are more than likely not finishing each set and flying individually to their destination from Thailand, or they should hire me as their shipping manager.